2 buildings at Lostock were completely overhauled. The works included completely removing the existing building facades and completely replacing that included metes framing, trespass paneling and Aluminium windows.

The works took over 12 months to complete and took place on two buildings, the 3 storey maths block and 2 storey admin block.