A good winter maintenance plan starts with three things: heating, pipes and emergency lighting. They’re three of the most common reasons a building closes in winter, when the heating fails, a pipe bursts, or the emergency lighting doesn’t work when it’s needed.

None of these is unusual, and most of the time they can be prevented. This article covers what goes wrong with each one, the checks that stop it, and what needs to happen if it fails anyway.

1. Heating

Boilers do very little over the summer. Then the first cold week arrives and they’re expected to run for long hours every day. That’s when faults that have built up over the summer tend to show, often first thing in the morning before the building opens.

For a school, that can mean a couple of hours to get the heating back on or send pupils home. For a shop or an office, it means staff working in coats and customers who don’t stay long.

The checks

  • Boilers and gas appliances serviced at least every 12 months, by a Gas Safe registered engineer
  • Controls and timers set for winter opening hours
  • A clear plan for who to call if the heating fails out of hours

2. Pipes

Pipes freeze in the parts of a building the heating doesn’t reach: plant rooms, roof spaces, external walls and empty units. The damage usually happens when they thaw. If the building is closed for the weekend or over Christmas, the water can run for hours before anyone notices.

Escape of water costs UK insurers close to £1 billion a year. For a business, the claim is only part of the cost, once you add damaged stock, ceilings, electrics and the days the site can’t open.

The checks

  • Exposed pipes and water tanks lagged
  • Heating kept at 4°C or above in quiet or empty areas
  • Staff know where the stopcock is and how to turn it off

The compliance checks after a leak

A burst pipe also brings two compliance checks that are easy to miss once the leak is fixed:

  • Water hygiene. Pipework that has been opened up or left standing can let legionella bacteria build up. HSE guidance (HSG274) says little-used outlets should be flushed at least weekly, and the system should be flushed and checked after a repair.
  • Electrical safety. If water has reached sockets, lighting or the distribution board, a competent person needs to check them before they’re used again.
3. Emergency lighting

By mid-November it’s dark by about 4:30pm. If the power fails after that, emergency lighting is what shows people the way out of the building.

Emergency lighting is a legal requirement under the Regulatory Reform (Fire Safety) Order 2005. BS 5266-1 sets out the testing: a functional test at least once a month, and a full-duration test at least once a year. Batteries that passed in spring can fail over the summer without anyone noticing, because nobody needed them.

The checks

  • Monthly functional test carried out and logged
  • Full-duration test within the last 12 months
  • Failed fittings replaced, not just recorded

Winter maintenance: planned checks cost less than call-outs

All three of these can be fixed after they fail, but it costs more. An emergency call-out is more expensive than a planned visit, the repair is usually bigger because the fault has had longer to develop, and a closed building costs you on top of both.

Planned maintenance and compliance testing won’t stop every breakdown. They mean fewer of them, found earlier, at a time that suits you.

One team for the checks and the call-outs

At Link, the engineers who carry out your servicing and compliance testing are the same people who come out when something breaks. We cover fire, electrical, water, gas and general maintenance across the UK.

  • Our helpdesk is answered 24 hours a day, 7 days a week, by our own team
  • Live vehicle tracking shows us which engineer is nearest
  • Every job is logged with photos and a report, so your records stay in one place

That means one number to call and one set of records, ready if your insurer or an inspector asks for them.

The bottom line

Heating, burst pipes and emergency lighting are behind a lot of winter closures, and most of them can be prevented. Put these three areas at the top of your winter maintenance plan before December, and make sure you know who to call if something fails out of hours.