Rugeley Leisure Centre only opened less than 10 years ago and its popularity drove the local council to expand the facility. Link Contracting was chosen to undertake the complex design works to double the gym floor area and increase membership numbers.
Work included a full steel framed structure with glu lam timber perlins. One elevation was full glazed and included state of the art HVAC equipment and electrics.