‘The Pinewoods’ is an exclusive gated development of luxury new build detached family homes. This housing development comprised the construction of 8 new build properties, refurbishment of 1 existing property and landscaping of the surrounding area including the formation of a new access road.

The houses are built and finished to an ultra-high specification including:

  • Bespoke Staircases
  • Aluminium Windows & Sliding Folding Doors
  • Custom Made Kitchens

Elements involved to carry out the project:

  • Working in conjunction with the JCT Intermediate Building Contract 2011
  • Construction Phase Health & Safety Plan incorporating a fire strategy plan.
  • Groundworks, including but not limited to; vibro compaction (to improve the ground), excavation, site levelling, concrete foundations & slab to garage areas (fully reinforced & insulated)
  • Suspended beam & block floor construction to ground floor
  • Brick & block cavity wall construction to external walls with feature artstone, render panels & timber cladding.
  • Manufacture and installation of aluminium windows & doors.
  • Timber floor structure to 1st floors
  • Installation of pre-manufactured roof trusses. Roofs finished with Marley Duo interlocking concrete tiles
  • Mechanical & electrical installation to comply with SBEN calculations including underfloor heating & smart home technology
  • New bespoke timber staircases
  • Stud & blockwork partitioning (fire rated)
  • Internal finishes to ceilings, floors & walls to an ultra-high specification
  • High specification bathroom and kitchen installations
  • External hard & soft landscaping including formation of new access road
  • Agreement of a tree strategy in compliance with the LA tree officer
  • Bat roosts incorporated within the new structures and trees